Chapter 4 Configuration Installation and Operation Manual
4-54 Configuring Egate-100 for Operation Egate-100 Ver. 4.0
Configuring the Ethernet Ports
Egate-100 provides two Gigabit Ethernet ports. You can use the second port as a
backup to ensure that the unit continues operating if the first port fails. For
instructions on enabling Gigabit Ethernet redundancy, refer to
Configuring
Protection
. The device also contains a Fast Ethernet management port.
³ To configure the Ethernet ports:
1. Navigate to Main Menu > Configuration > Physical Layer > Ethernet.
The Ethernet menu appears as illustrated in
Figure
4-52
.
2. Under Port, specify the desired Gigabit Ethernet link or the management
Ethernet port.
The relevant Ethernet port parameters appear.
3. Specify the Ethernet port parameters according to
Table
4-26
.
4. Select Save.
Egate-100
Main Menu> Configuration> Physical Layer> Ethernet
1. Port > (GbE-1)
2. Port Name > (Port GbE)
3. Administrative Status > (Up)
4. Auto Negotiation > (Disabled)
5. Speed & Duplex > (100BaseT Full Duplex)
6. Alarms > (Unmasked)
Please select item <1 to 4>
ESC-prev.menu; !-main menu; &-exit
Figure
4-52. Ethernet Physical Port Menu – Autonegotiation Disabled
Egate-100
Main Menu> Configuration> Physical Layer> Ethernet
1. Port > (GbE-1)
2. Port Name > (G-ETH Port 1)
3. Administrative Status > (Up)
4. Auto Negotiation > (Enabled)
5. Max. Capability Advertised > (1000BaseT Full Duplex)
6. Alarms > (Unmasked)
Please select item <1 to 4>
ESC-prev.menu; !-main menu; &-exit
Figure
4-53. Gigabit Ethernet Physical Port Menu – Autonegotiation Enabled
Przeglądanie stron 145
1 2 ... 141 142 143 144 145 146 147 148 149 150 151 ... 317 318

Komentarze do niniejszej Instrukcji

Brak uwag