RAD Data comm MBE10-8D Dokumentacja Strona 39

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 50
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 38
MBE Family Installation and Operation Manual Chapter 3 Operation
Operating Instructions 3-3
Power-on
To power-up MBE:
1. Set the POWER switch on the rear panel to the ON position.
The POWER indicator lights up, indicating that MBE is powered on. After
about 1 minute, the operational status screen appears on the terminal
screen.
2. Press the <Enter> key several times to display the password prompt.
Operating MBE
To operate MBE:
1. Configure MBE according to the application (see the LAN RANger Series
Configuration Guide).
2. During normal operation (when the remote workstations are active):
The READY indicator lights up continuously
The Tx and Rx indicators blink occasionally
The LAN and LINK error indicators remain OFF.
Power-off
To power-off MBE:
Set the POWER switch on the rear panel to the OFF position.
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com
Przeglądanie stron 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 49 50

Komentarze do niniejszej Instrukcji

Brak uwag